Advanced search

Message boards : Number crunching : not getting Adria WUs

Author Message
WPrion
Send message
Joined: 30 Apr 13
Posts: 96
Credit: 2,643,434,111
RAC: 20,025,528
Level
Phe
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 46786 - Posted: 26 Mar 2017 | 12:41:36 UTC

If I'm reading the server stats page correctly, unsent long-run Adrias outnumber unsent long-run Pablos by about 8:1, yet I haven't rcvd a long-run Adria since March 20th. (This includes the 2 days I was shut down due to quotas and bad Pablos).
Are projects given a priority with some more urgent than others? Or is everyone else aborting their Pablos to get Adrias? ;-)

Profile Retvari Zoltan
Avatar
Send message
Joined: 20 Jan 09
Posts: 2343
Credit: 16,206,655,749
RAC: 261,147
Level
Trp
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 46789 - Posted: 26 Mar 2017 | 16:56:40 UTC - in response to Message 46786.

Are projects given a priority with some more urgent than others?
Yes.

Post to thread

Message boards : Number crunching : not getting Adria WUs

//