Advanced search

Message boards : Number crunching : 1_2-CRYPTICSCOUT_pocket_discovery - aborted by project

Author Message
Erich56
Send message
Joined: 1 Jan 15
Posts: 1132
Credit: 10,205,482,676
RAC: 29,855,510
Level
Trp
Scientific publications
watwatwatwatwatwatwatwatwat
Message 60231 - Posted: 30 Mar 2023 | 5:06:06 UTC

Again, as many times before, the recent batch of ACEMD-3 tasks contained "1_2-CRYPTICSCOUT_pocket_discovery_" tasks - they are being downloaded, but then: 202 (0xca) EXIT_ABORTED_BY_PROJECT.
So, what sense does this make?

Ian&Steve C.
Avatar
Send message
Joined: 21 Feb 20
Posts: 1069
Credit: 40,231,533,983
RAC: 527
Level
Trp
Scientific publications
wat
Message 60235 - Posted: 30 Mar 2023 | 12:38:09 UTC - in response to Message 60231.

As with the other times you've asked this same question, the answer is the same. All you have to do is look at the WU history to see why.

http://www.gpugrid.net/workunit.php?wuid=27442726

a previous host completed and returned it before you started processing it. at that point, there is no point for you to waste compute time to process something that already has a result. so it's cancelled by the server. this is a good thing.
____________

Post to thread

Message boards : Number crunching : 1_2-CRYPTICSCOUT_pocket_discovery - aborted by project

//